The trusted off-grid Power Solution

Alaska

Cape Decision Light House

Location: South-East Alaska, 220 miles from nearest town
Access: Helicopter or boat
Loads: Beacon, meteorological sensors, video cameras
Operator: Local Marine Organization
Generators: 1 pcs. NEW ENERDAY REMOTE 250
Fuel Consumption: 1 kg/day – 2.2 lbs/day
Fuel Cell Operation: 120…150 days/year during winter season
Autonomy: Annual refill and maintenance
Year of Installation: 2026

Alaska

Point Baker Microwave Radio Station

Location: South-East Alaska, 200 miles from nearest town
Access: Helicopter, float plane or boat
Loads: Microwave Radio Site, approx. 500 W
Operator: Leading telecom operator
Generators: 2 pcs. NEW ENERDAY REMOTE 400 in parallel
Consumption: 3.36 kg/day - 7.41 lbs/day
Fuel Cell Operation: 145…170 days/year during winter season
Autonomy: Annual refill and maintenance
Year of Installation: 2025

Alberta, Canada

Fire Outlook and Radio Station at 9,000 ft

Location: Alberta, 1.5 hours West of Calgary
Access: Helicopter, or 4x4 road
Loads: Radio and video equipment, approx. 60 W
Operator: Leading telecom operator
Generators: 1 pcs. NEW ENERDAY REMOTE 400
Consumption: 1.8 kg/day – 3.9 lbs/day
Fuel Cell Operation: approx. 150 days/year during winter season
Autonomy: Annual refill and maintenance
Year of Installation: 2023

British Columbia, Canada

Autonomous Drone Port for Pipeline Inspection

Location: Northern British Columbia
Access: Gravel Road
Loads: Drone and video equipment
Operator: Oil & Gas company
Generators: 1 pcs. NEW ENERDAY REMOTE 400
Consumption: 1.8 kg/day – 3.9 lbs/day
Fuel Cell Operation: continuously
Autonomy: Bi-monthly refill and annual maintenance
Year of Installation: 2023

These projects are supported by the German Federal Ministry for Economic Affairs and Energy as part of the Renewable Energy Solutions Programme of the German Energy Solutions Initiative.